  • What kind of payment terms can we accept?

    Payment in advance, Installment payments, Letter of credit(L/C).
  • What is the lead time of products?

    According to different products, the lead time is different.
    For standard products like APF,SVG, the lead time is one week.
    For customized capacitor bank etc,  the lead time is 25 to 45 days.
  • How to find the product model if you are some demand?

    If you need our technical guide, please advise your problem details as much as you can, we can give more reasonable solution.
    You may provide following drawings or report
    Single line drawing
    Panel primary scheme drawing
    Power quality test report (mainly about harmonics)
  • How to find the product model if you have details electrical drawings?

    Please advise Load name plate, load working condition, existing power factor, target power factor, harmonic times etc Or Rated voltage, compensation capacity, harmonic times(reactor detuning factor), other components etc.
  • How to find the product model if you can not provide enough information?

    We can supply your products according to your technical requirement.
    We can go to your project site and give a professional test report after test.
  • Why do we choose Sanhe power quality solution?

    Sanhe has specialized in over 20 years experience in power quality products and solution. We have met most of power quality problems and gave the solutions.
  • What kind of technical service does Sanhe provide?

    • Project-site power quality test ( or test report from customer)
    • Improvement solution and budget
    • Product solution and price
    • Products supply
    • Product commissioning

  • What kinds of standards does Sanhe product conform to?

    Except China standards,Sanhe products also conform to
    IEC standards including
    IEC61921 :2003
    IEC61000-4-5:2005 IEC60529:2001
    IEC60931-1: 1996
    IEC60439-1 :2005 IEC60664-1 2007
    IEC60831-1: 1996
    IEC61000-4-3/2/4/5/18 IEC61000-2-4
    IEC60255 IEC62208 2011…
    IEC255-22-1
  • What is the compensation effect after using Sanhe products?

    • Harmonic filtering meets standard
    • Power factor is over 0.95, electrical bill saving, low reactive power penalty killing
    • Reducing the loss of transformer and line improve the distribution ability, prolong the lifespan of electrical equipment
  • How long is the product guarantee time?

    Usually, the guarantee time is one year. However, we can accept over 5 years too. Please contact our sales to get details information. 
  • How to become the distributor or agent of Sanhe brand products?

    Sanhe is looking for overseas distributor and agent. If you are interested in it, please feel free to contact us. Yvonne.zhang@samwha-cn.com or whatsapp: +86-13418990147
  • The hazard of harmonics

    (1) Harmonics affect the normal work of all kinds of electrical equipment. The influence of harmonics in the motor will not only cause additional loss, but also produce mechanical vibration, noise and overvoltage, leading the transformer local serious overheating. Harmonics make capacitors, cables and other equipment overheating, insulation aging, life shortening, and direct damage. 
  • What is soft start?

    The voltage is slowly raised from zero to rated voltage, in this way, the starting current of the motor in the starting process turns the past overload impulse current not controlled into controllable. And the device conforms the need to adjust the  the starting current. Smooth start-up operation took the place of impact torque in the whole  motor start-up process. This is soft start.
  • What is "three-phase compensation"?

    Some new switching switches, such as compound switch and thyristor module, which can work independently for A, B and C phase, in this way,the device is able to compensate any switching single phase. This kind of compensation aim for the single phase is called "Phase-split compensation".
  • Three-phase unbalance hazard

    Causing heavy load phase heating serious, accelerating cable aging;
    Producing neutral line current, leading to local heating and aging of the Central Line, and even the risk of fire;
    Causing ground zero voltage getting too high, which leads to the weak point control system equipment burn down.
    leading to local voltage imbalance, causing equipment false alarm;

About Us

We have been specialized in power quality,EnMS and Electrical engineering. We take advantages of lean production, product design, engineering management, project service etc.

Quick Links

Product Category

Contact Us

Tel: +86-13502854349
Whatsapp: +86-13418990147
E-Mail: yvonne.zhang@samwha-cn.com

Subscribe Now

Copyright© 2023 Sanhe Power Tech (Shenzhen) Co., Ltd. All Rights Reserved.| Sitemap  | Support By Leadong